Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Proper way to install roof drip edge.
Slightly open the hemmed edge to slide this piece over top of the installed piece on the eave.
Tom silva starts off his roofing lesson with the apprentices by stressing the.
Make sure the outer edge extends over the gutter.
Once all the underlayment is applied go back and place.
If it doesn t pull the drip edge out slightly from under the shingles.
The easiest way to prevent this from happening is to install a drip edge at the eave and the rake.
This could cause the sheathing or fascias to rot after a few years.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
How to install drip edge flashing to a new roof.
On the gable rake install drip edge starting at the bottom and working up.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
When this occurs the water may run back under the edge of the shingles often wetting the roof deck.
How to fix a roof drip edge installing roof drip edge flashing properly.
Align the leading bottom edge of the first piece on the gable rake with the front edge of the drip edge installed on the eave.
When lapping the eave metal overlap them so the seam faces away from the direction of prevailing view.
Save yourself some.
Overlap pieces at least a couple of inches shingle style with pieces higher up on the roof overlapping pieces lower.
The causeway connecting the house to the new garage in law suite needs a roof.
Secure the drip edge with roofing cement.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
No cutting is needed for this piece.
Three tips for overlapping drip edge flashing.
Preformed drip edge can be made of aluminum galvanized steel or copper.
Tip 2 is.
Place the metal roof drip edge flashing along the gable ends.