This is a list of mostly moratorium horror classics from the last 4 decades that stand out for me and hopefully for you the most.
Plastic over second floor horror sealed.
If the slab is going to get a finish floor over it then there are no worries since it won t be seen.
Anything less is a very bad idea.
Placing a basement vapor barrier over exposed bottoms of overhead floor joists forming the basement ceiling.
Minimum recommended reinforcing per aci is 0 18.
Cure floor with linseed oil process as per the previous method.
A second story deck that is made of wood flooring includes gaps between planks and around the perimeter of the deck.
Butyl tape is applied to seal all seams.
If you live in a house with an extra guest room basement or surplus bathrooms that don t get a lot of use then frugal living blog the simple dollar recommends you seal those rooms off to help.
Systems are available in a variety of materials so that you can match it to your deck and home s style.
Decking boards are then installed over the top.
The usual way to separate a damp crawl space from a wood framed floor assembly is to install a continuous layer of foil faced polyisocyanurate on the underside of the floor joists.
Each of the layers in this method needs to be completely dry before starting the next layer.
The downspouts can be oriented to fit between joists spaced 12 or 16 inches on center.
For 3 1 2 slab a 6x6 w4 0xw4 0 will do.
So there you go there are many other ways to build a long wearing earthen floor other than these two methods but that s a start.
A concrete floor with a too high moisture content can wreak havoc on a vinyl floor.
For installation of vinyl flooring you need a smooth even surface for the underside of the flooring to achieve the best contact for adhesion.
Water seeps through these gaps onto the level below.
A concrete floor seems like the perfect base for a vinyl floor installation.
The trex rainescape membrane which comes in rolls is fastened loosely to the top edge of deck joists.
One option for a floor air vapor barrier is a polyethylene plastic sheet placed over the floor joists and sealed to the wall vapor barrier.
I made this list as a way to contribute to those who may be fatigued by the same recycled horror we ve been plagued with for so long.
Slab on grade done wrong note the layer of granular material over the top of the plastic vapor barrier.
To avoid this leaking problem you must install an under deck system.
I never spec slabs less than 5 on my projects.